
Provision is helping us to minimize the risk that are commonly assumed during the meeting process. With Provision, we could ensure that all the stakeholders during the bidding and construction phase are happy and have the path or the next step clear. The way that Provision understands the contracts or any contracts is one of the most valuable features that we could have with this tool

The thing that we normally find is the GCs do the same as everyone else. They'll reuse a contract from a previous project or something, at least that's what I'm guessing has happened. Provision helps us catch leftover items in contracts, like a requirement for painting a pipe that wasn’t relevant to our project. It prevents us from being stuck with obligations that were copied and pasted from a previous job, saving us from unnecessary work and ensuring clarity with the GC




